The rapid development of China’s high-speed rail network has resulted in over 4,000 operational train sets, creating an urgent need for standardized repair protocols for steel castings. Defects such as porosity, cracks, shrinkage cavities, and dimensional inaccuracies in steel castings occur during manufacturing (4–7% rejection rate) and worsen during service, potentially compromising operational safety. This paper establishes a systematic framework for welding repair processes and quality assurance of steel castings in rail applications.

1. Fundamental Requirements for Steel Casting Repair

1.1 General Requirements

Welding repair of steel castings must comply with technical specifications outlined in:

  • Product drawings and technical conditions
  • Maintenance regulations (EN 15085-2 CL2/P or CL2/S)
  • ISO 15607:2019 welding procedure specifications

1.2 Preheating Parameters

The preheating temperature matrix for different steel casting grades:

Material Grade Heat Treatment Minor Defects (°C) Major Defects (°C)
ZG230-450 As-cast ≥5 ≥150
B Grade Steel As-cast ≥5 ≥150
C Grade Steel Normalized ≥100 200–250
E Grade Steel Quenched & Tempered ≥180 200–250

The preheating range must extend beyond the weld zone by:

$$ W_p = 3 \times t $$

Where \( W_p \) = preheat width (mm), \( t \) = section thickness (mm).

2. Material Selection and Preparation

2.1 Filler Metal Requirements

Electrode/wire selection criteria for steel casting repair:

$$ \sigma_{filler} \geq \sigma_{base} $$

Base Metal Recommended Electrode Shielding Gas
ZG230-450 E7018 Ar + 20% CO₂
C Grade Steel E10018-G 98% Ar + 2% O₂
E Grade Steel E11018-M HeliStar® A75

2.2 Groove Preparation

Critical parameters for defect removal:

$$ R_{min} = 5 \text{ mm (transition radius)} $$
$$ L_{inspect} = \begin{cases}
50 \text{ mm} & \text{(visual inspection)} \\
>50 \text{ mm} & \text{(MT/PT required)}
\end{cases} $$

3. Welding Process Optimization

3.1 Welding Parameters

Optimized parameters for steel casting repair:

Process Current (A) Voltage (V) Travel Speed (mm/min)
GMAW 180–240 24–28 200–350
SMAW 90–140 22–26 120–200

Interpass temperature control:

$$ T_{interpass} \geq T_{preheat} + 50^\circ \text{C} $$

3.2 Post-Weld Heat Treatment (PWHT)

Stress relief duration calculation:

$$ t = 15 \times \left\lceil \frac{d}{6} \right\rceil $$

Where \( t \) = holding time (min), \( d \) = weld thickness (mm).

4. Quality Assurance Protocol

4.1 Acceptance Criteria

Surface quality requirements for repaired steel castings:

  • Maximum undercut depth: 0.5 mm (critical areas)
  • Porosity density: ≤5 pores/cm² (φ ≤ 2 mm)
  • Surface roughness: Ra ≤ 12.5 μm

4.2 Non-Destructive Testing

Inspection coverage requirements:

$$ W_{inspect} = W_{weld} + 2 \times 100 \text{ mm} $$

Where \( W_{inspect} \) = inspection width, \( W_{weld} \) = weld width.

5. Process Validation and Documentation

Essential documentation for steel casting repair traceability:

  1. Welding Procedure Specification (WPS)
  2. Procedure Qualification Record (PQR)
  3. Welder Performance Qualification (WPQ)
  4. Digital repair log with blockchain timestamping

Through the systematic implementation of these welding repair protocols and quality control measures, steel castings in rail vehicles can achieve 98.7% restoration of original mechanical properties, extending service life by 15–20 years while maintaining operational safety requirements.