Grooved mechanical couplings are widely used to join liquid and gas pipelines without flanging or welding. A coupling consists of a rubber sealing ring, a cast clamp, and locking screws. The clamp is commonly produced in cast steels such as ZG27SiMn, ZG270-500, or ZG310-570. For a nominal diameter of 108 mm, the casting must pass a 0.15 MPa pressure test held for 10 min without leakage. Its internal groove must seat the rubber seal without excess metal or burrs, and its surfaces must be smooth enough for a uniform protective coating. Castings with slag inclusions, cold shuts, gas holes, or shrinkage cavities that could impair mechanical performance are not acceptable. Where higher pressure ratings are required, local thickening around the assembly holes is used to strengthen the most highly stressed region.
Lost foam casting is well suited to this geometry because an expendable pattern can reproduce the internal groove and external profile without draft or parting lines. An EPS pattern is coated with a refractory layer, embedded in loose sand, compacted by vibration, and held under vacuum while molten steel is poured. The metal displaces the pattern, and the EPS decomposes into gas and liquid residues that must escape through the coating and sand. The process therefore depends on a balance among pattern density, coating strength and permeability, sand compaction, vacuum level, gating, and pouring temperature.

Pattern, coating, and sand process window
For the 108 mm clamp, the production window summarized in Table 1 was established around the interactions that control pattern gas evolution and mold filling. The nominal EPS bead diameter was 1.5 mm. For routine production control, a range of 1.5–2.0 mm was used to avoid excessively dense patterns while maintaining adequate cavity filling. The dried pattern weight was held at 0.018–0.020 kg.
| Parameter | Value or target |
|---|---|
| Nominal clamp diameter | 108 mm |
| Cast steel grades | ZG27SiMn, ZG270-500, ZG310-570 |
| Pressure test | 0.15 MPa for 10 min, no leakage |
| EPS bead diameter | 1.5 mm nominal; 1.5–2.0 mm production control |
| Pre-expansion | 40 °C for 5 min |
| Pattern molding | 80 °C for 20 s |
| Blowing-agent content | 5.5 wt% |
| Dried EPS pattern weight | 0.018–0.020 kg |
| Coating application | 2 coats; total thickness 1.0–1.2 mm |
| Coating drying | 50–55 °C, relative humidity below 30%, 8 h per coat |
| Sprue | 1 sprue, 75 × 60 mm |
| Runners | 3 runners, 60 × 40 mm |
| Ingates | 60 ingates, 10 × 10 mm, for 60 patterns per flask |
| Sand | Baozhu spherical ceramic sand; 100 mm sand layer below the pattern |
| Vibration | 40 s; 3 compaction cycles; 10 m/s2; 30 Hz |
| Vacuum level | 0.05 MPa |
| Tapping temperature | 1690–1700 °C |
| Pouring temperature | 1660–1670 °C, target 1670 °C |
| Shakeout | After at least 4 h |
The water-based coating formulation is given in Table 2. Zircon flour provides the main refractory aggregate, quartz powder acts as a supplementary refractory filler, and lithium bentonite stabilizes the suspension. CMC and water-soluble phenolic resin provide complementary binding, while the wetting agent, defoamer, and preservative control slurry behavior and storage.
| Constituent | Function | Mass fraction |
|---|---|---|
| Zircon flour | Refractory aggregate | 40% |
| Quartz powder | Refractory filler | 40% |
| Lithium bentonite | Suspending agent | 2% |
| Carboxymethyl cellulose sodium, CMC | Composite binder | 1.5% |
| Water-soluble phenolic resin | Organic binder | 3% |
| OP-10 | Wetting agent | 0.02% |
| n-Butanol | Defoamer | 0.02% |
| Sodium benzoate | Preservative | 0.02% |
| Water | Carrier | Balance |
Coating thickness is a compromise between gas permeability and resistance to metal erosion. A coating that is too thin can rupture under vacuum and metal pressure; one that is too thick or too viscous restricts gas escape. The specified 1.0–1.2 mm coating, applied in two coats and dried at 50–55 °C under 30% relative humidity or lower, is intended to preserve both functions. Incomplete drying is especially harmful because residual water adds gas to the mold cavity during pouring.
Gating, sand compaction, and pouring
The gating system uses one sprue, three runners, and 60 ingates to feed 60 patterns in a single flask. This arrangement distributes steel to many small castings but places strict demands on stable filling and gas removal. A 100 mm sand layer beneath the pattern provides support and reduces the risk of sand collapse. Vibration is applied for 40 s in three compaction cycles at 10 m/s2 and 30 Hz. The vacuum level is 0.05 MPa during pouring.
Steel is tapped at 1690–1700 °C and poured at 1660–1670 °C, with 1670 °C as the target. The pouring cup is kept full throughout casting to avoid air entrainment and unstable flow. Shakeout is delayed for at least 4 h so that the casting can cool sufficiently before it is subjected to handling loads.
Defect mechanisms and countermeasures
Misruns at the middle and end of the runner
Misruns occurred mainly in the middle or at the end of the runners. The location is diagnostic because the two positions are associated with different mechanisms. A misrun at the middle of a runner generally indicates gas backpressure. If the EPS beads are too small, the pattern becomes denser and contains more EPS mass per unit volume. During pouring, a larger mass of EPS decomposes into a larger volume of gas. When this gas cannot escape through the coating and sand quickly enough, pressure builds in the mold cavity and opposes the advancing metal front.
The countermeasure is to maintain the EPS bead size within 1.5–2.0 mm, control the pattern-filling operation so that the bead charge is neither loose nor over-compacted, and keep the dried pattern weight at 0.018–0.020 kg. These measures limit pattern density and the associated gas load while preserving the detail required in the seal groove.
A misrun at the end of a runner is primarily a heat-transfer and filling-rate problem. The steel loses heat as the EPS pattern decomposes; in this process, the melt front loses approximately 50 °C on average. If the superheat is insufficient, or if the pouring rate is too low, the metal reaching the runner end may fall below its fluidity limit and solidify before filling the last cavity. The remedy is to tap at 1690–1700 °C, pour at 1660–1670 °C, and maintain a full pouring cup to keep a steady driving head. Pouring temperature and pouring speed must be controlled together; raising temperature alone does not compensate for an interrupted or excessively slow pour.
Excess metal at assembly holes and edges
Excess metal, including penetration and flash, appeared at assembly holes and sharp edges. At an assembly hole, the problem originated from sand compaction. When the pattern was placed vertically in the flask, the hole lay transversely to the sand flow. Sand could not compact fully inside the hole, leaving a gap between the sand and the coating. Under vacuum, the unsupported coating could rupture, allowing steel to escape into the void and form excess metal inside the hole.
The corrective action is to place the pattern horizontally so that the assembly hole faces the sand-filling direction. Sand then fills and compacts within the hole, supporting the coating and preventing metal penetration.
At sharp edges, excess metal was associated with coating wear and air entrapment. Excessive vibration causes the sand to abrade the coating, and the thinning is most severe at corners. A coating that becomes too thin cannot resist the erosive action of flowing steel, so metal penetrates the sand. Direct dipping of the pattern can also trap air bubbles at sharp corners; during pouring, steel fills the bubble voids and produces localized excess metal.
The countermeasures are to limit vibration to 40 s, control the sand so that its angularity factor remains below 1.1, and change the dipping procedure. The pattern is introduced slowly along its semicircular direction so that the slurry flows along the raised groove and covers the surface progressively. This reduces bubble entrapment at corners. Where excess metal is associated with high slurry viscosity and entrained air, a lower binder addition and the specified defoamer help improve coating permeability and reduce bubble formation.
Deformation in the 108 mm direction
Deformation occurred along the 108 mm diameter direction. After coating, the EPS pattern becomes softer, and the way it is supported during drying directly affects dimensional distortion. Early shakeout is a second cause: rapid cooling after pouring can produce contraction deformation before the casting has developed sufficient rigidity.
The pattern is therefore placed on a dedicated drying rack after coating, with side contact against the rack and no load applied across the 108 mm direction. Shakeout is delayed until at least 4 h after pouring.
Randomly located gas porosity
Gas porosity appeared at no consistent location. Four conditions contributed. First, a thick or highly viscous coating reduced gas permeability and made venting difficult. Second, the gating system could fill the mold quickly but leave insufficient time for gas evacuation. Third, the pouring rate and vacuum level were not always matched, so gas generated by pattern decomposition could not escape before the metal front advanced. Fourth, insufficient drying left residual moisture in the coating, adding gas during pouring.
The corrective measures are to hold the coating thickness at 1.0–1.2 mm, follow the formulation and application procedure, verify that the gating system provides smooth filling without backflow at the sprue, and control the pouring time so that it does not exceed the time required for complete pattern decomposition and gas removal.
| Defect | Typical location | Dominant mechanism | Process correction |
|---|---|---|---|
| Misrun | Middle of runner | Over-dense EPS pattern generates excessive decomposition gas; backpressure arrests the metal front | Control bead size at 1.5–2.0 mm; regulate pattern filling; hold dried pattern weight at 0.018–0.020 kg |
| Misrun | End of runner | Heat loss to EPS decomposition and slow pouring reduce fluidity at the last-filled section | Tap at 1690–1700 °C; pour at 1660–1670 °C; keep the pouring cup full |
| Excess metal | Assembly hole | Poor sand compaction in a transverse hole; vacuum ruptures the unsupported coating | Orient the pattern horizontally so the hole faces the sand flow |
| Excess metal | Sharp edges | Coating wear from over-vibration or air entrapment during dipping | Limit vibration to 40 s; sand angularity factor below 1.1; slow directional dipping; use defoamer |
| Deformation | 108 mm diameter direction | Pattern distortion during drying and contraction after early shakeout | Use a drying rack with side support; avoid loading the diameter; shake out after at least 4 h |
| Gas porosity | Random | Thick or viscous coating, insufficient venting time, vacuum–pouring mismatch, residual moisture | Maintain 1.0–1.2 mm coating; control drying; verify gating; match pouring time to gas removal |
Coupled variables and transferability
The defects are not independent. Bead size, coating thickness, vibration time, vacuum level, and pouring temperature all influence more than one failure mode. Smaller beads can improve pattern detail but increase pattern density and gas evolution. Longer vibration improves sand compaction but wears the coating, especially at corners. A higher vacuum helps evacuate gas but increases the risk of drawing metal through a weak coating. A higher pouring temperature improves fluidity but can worsen penetration and coating erosion.
The values in Tables 1 and 2 therefore define a coupled process window rather than a set of independent optima. Transfer to other clamp sizes or wall sections requires revalidation of pattern weight, gating, coating thickness, sand compaction, vacuum, and pouring temperature. For the 108 mm clamp, the combination of controlled EPS density, a permeable but erosion-resistant coating, directional sand compaction, and matched pouring conditions provides the basis for stable production and consistent pressure-test performance.