Process and quality inspection of large steel castings

1. Casting process

Fig. 1 is the casting process diagram of the main frame and hub of 6 MW wind turbine generator. Both of them are of multi box shape. The main frame machine adopts the inner sprue and the sprue, which are three sets of independent bottom pouring systems of ceramic pipes, while the inner sprue adopted by the wheel hub is the slit gate, and the sprue is two sets of independent bottom pouring systems of ceramic pipes. The calculated pouring time is 153 s and 139 s respectively. One heating and insulation riser with d = 300 mm and four duckbill risers with d = 230 mm are set on the top of the main frame machine casting; Three heating and thermal insulation risers with d = 300 mm shall be set at the top of the hub casting, and cold iron shall be placed on the thick section and machining surface.

2. Smelting process

Medium frequency induction furnace melting adopts the impulse method and the combination of light and heavy rare earth spheroidizing agents for spheroidizing treatment, and the compound inoculation treatment is carried out by flow inoculation and in ladle inoculation. The chemical composition and particle size of spheroidizing agent and inoculant are shown in Table 1.

Material nameMg(%)Re(%)Si(%)Al(%)Ca(%)Ba(%)Particle size mm
Light rare earth spheroidizing agent5.50~6.100.60~1.2043~470.4~0.95~30
Heavy rare earth spheroidizing agent6.90~7.401.90~2.6040~440.9~1.55~30
Flow inoculant71~770.9~1.20.5~0.90.2~0.8
Package inoculant71~770.9~1.20.9~1.41.9~2.93~8

3. Production and quality inspection

(a)Main frame machine casting test block (b)Main frame casting machine
(c)Wheel hub casting test block (d)Wheel hub casting machine
CastingRm/MPaRp0. 2/MPaA(%)Impact absorption energy (- 20 ℃) / J
Main frame machine38126226.4512 14 13
Hub38125226.2314 13 12

After measurement, the actual pouring time of main frame and hub is 143 s and 124 s respectively. After pouring, the surface quality, shape and size, physical and chemical inspection, magnetic particle flaw detection, ultrasonic flaw detection and metallographic analysis of the body shall be carried out. The inspection results meet the requirements of the technical specifications. The experimental results of mechanical properties are shown in Table 2 and the chemical composition is shown in Table 3. As shown in Figure 2, the metallographic analysis photos of the cast test block and its body of the main frame and hub are shown. It can be seen from the figure that there is no graphite distortion such as graphite flowering in the cast test block and body of the main frame and hub, and there are very few graphite floating and slag inclusion. The produced castings meet the technical specifications.

CastingC(%)Si(%)Mn(%)P(%)S(%)RE(%)Mg(%)
Main frame machine3.542.110.090.0280.0100.0170.057
Hub3.482.070.080,0270.0100.0140.058